首页 | 本学科首页   官方微博 | 高级检索  
     

压水堆核电站主回路安装设计改进
引用本文:王恒,于坚.压水堆核电站主回路安装设计改进[J].中国核电,2012(3):214-218.
作者姓名:王恒  于坚
作者单位:中国核电工程有限公司,北京100840
摘    要:分析了现有压水堆核电站主回路安装设计的特征,并提出相应改进方案,通过对现有技术和改进技术的对比,阐述了反应堆冷却剂系统主回路安装设计改进技术的优点,希望能对提高压水堆核电站主回路的安装及质量控制水平起到促进作用。

关 键 词:核电厂  主回路  蒸汽发生器  安装  设计

Study on Installation and Design Improvement for the Primary Loop of PWR NPP
WANG Heng,YU Jian.Study on Installation and Design Improvement for the Primary Loop of PWR NPP[J].China Nuclear Power,2012(3):214-218.
Authors:WANG Heng  YU Jian
Affiliation:(China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)
Abstract:This paper analyses the present characteristics of installation and design for the primary loop of PWR NPP,and correspondingly puts forward the improved options.By contrasting the present and improved techniques,it discusses the advantages of installation and design improvement for the primary loop of reactor coolant system.We hope that the paper contribute to raising the level of installation and quality control for the primary loop of PWR NPP.
Keywords:nuclear power plant  primary loop  steam generator  installation  design
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号