Supervisory control at salvador flotation columns
Affiliation:4. Chemical Engineering Department, Santa María University, Valparaíso, Chile;2. Salvador Concentrator, Codelco-Chile, Salvador, Chile;1. University of South Australia, UniSA STEM, Future Industries Institute, Mawson Lakes, Adelaide, SA 5095, Australia;2. University of Adelaide, School of Computer Science, North Terrace, Adelaide, SA 5005, Australia;3. University of Adelaide, School of Chemical Engineering and Advanced Materials, North Terrace, Adelaide, SA 5005, Australia;1. International Joint Research Laboratory of Henan Province for Underground Space Development and Disaster Prevention, School of Civil Engineering, Henan Polytechnic University, Jiaozuo 454000, China;2. Civil and Resource Engineering School, University of Science and Technology Beijing, Beijing 100000, China
Abstract:The experience of developing, implementing and evaluating a hierarchical control strategy in a flotation column circuit at Salvador is discussed. The supervisory control system was installed in two columns in the copper cleaning circuit. Salvador concentrator produces over 200,000 tons per year of 30% copper concentrate.The column control is organised at two different levels: regulatory and supervisory control. The supervisor, SINCO-PRO, was developed to consider mainly three aspects: process data validation, metallurgical objectives control and operating problems detection. The system was installed in August 1997, and fine-tuning, was completed in October 1997. Evaluation of the new implemented system was performed in November and December 1997. The main results were an average increment in the concentrate grade of 1.2% without loss in process recovery, and a decrement in the standard deviation of the concentrate grade from 0.9 to 0.7 %. The global operation of the cleaning circuit was stabilised, increasing the average feed grade from 8 to 10 % and dramatically reducing its standard deviation from 1.8 to 0.4 %. This stabilisation of the whole circuit allowed a tighter pH control with a significant reduction in chemical reagent consumption. The project was paid during the first two month of the evaluation period.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号