首页 | 本学科首页   官方微博 | 高级检索  
     

官地水电站碾压混凝土坝温控技术研究
引用本文:汪卫兵,马志峰,车军.官地水电站碾压混凝土坝温控技术研究[J].水利水电技术,2014,45(8):98.
作者姓名:汪卫兵  马志峰  车军
作者单位:(雅砻江流域水电开发有限公司,四川成都610000)
摘    要:由于特殊的气候条件,官地水电站碾压混凝土大坝混凝土浇筑施工难度大,温控问题突出。通过严格控制混凝土入仓温度、通水冷却和混凝土保温等措施,取得良好的温控效果。研究成果可供相关研究人员参考。

关 键 词:官地水电站  碾压混凝土坝  温控技术  
收稿时间:2013-06-25

Study on temperature control technology for roller compacted concrete dam of Guandi Hydropower Station
WANG Weibing,MA Zhifeng,CHE Jun.Study on temperature control technology for roller compacted concrete dam of Guandi Hydropower Station[J].Water Resources and Hydropower Engineering,2014,45(8):98.
Authors:WANG Weibing  MA Zhifeng  CHE Jun
Affiliation:(Yalong River Basin Hydropower Development Co., Ltd., Chengdu610000, Sichuan,China)
Abstract:Because of the special climate condition, the concrete placement of the roller compacted concrete dam of Guandi Hydropower Station is quite difficult; especially, the problem form the temperature control is extremely prominent. Through the measures of the strict control of the concrete placing temperature, water cooling, concrete insulation, etc., a better effect of temperature control is obtained. The study result can provide a reference for the relevant researchers.
Keywords:Guandi Hydropower Station  roller compacted concrete dam  temperature control technology  
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号