首页 | 本学科首页   官方微博 | 高级检索  
     

疏勒河青羊沟水电站枢纽挑流消能鼻坎设计与优化
引用本文:蒋小鹏,赵冠松.疏勒河青羊沟水电站枢纽挑流消能鼻坎设计与优化[J].水利水电技术,2014,45(7):33.
作者姓名:蒋小鹏  赵冠松
作者单位:(1.甘肃省水利水电勘测设计研究院,甘肃兰州730000;2.中国人民武装警察部队水电指挥部,北京100055)
摘    要:青羊沟水电站枢纽采用挑流消能设计,枢纽布置为3孔泄洪表孔和1孔泄洪冲沙表孔。枢纽下游河床非常狭窄,宽度仅为20余m,消能防冲设计难度大,对挑流鼻坎在不同流量下的水力性能要求很高。原设计采用宽尾墩结合扭曲式鼻坎消能,左右表孔出口水流对两岸坡脚有直接冲刷,且对下游河道的冲刷深度较大。针对原设计水流冲刷两岸及冲深较大的问题,结合枢纽水工模型试验,优化了鼻坎体型,使挑坎结构布置安全、合理,并满足运行要求。

关 键 词:青羊沟水电站  挑流鼻坎  冲刷  疏勒河  
收稿时间:2014-04-22

Design and optimization of flip trajectory bucket for Qingyanggou Hydropower Station on Shulehe River
JIANG Xiaopeng,ZHAO Guansong.Design and optimization of flip trajectory bucket for Qingyanggou Hydropower Station on Shulehe River[J].Water Resources and Hydropower Engineering,2014,45(7):33.
Authors:JIANG Xiaopeng  ZHAO Guansong
Affiliation:(1. Water Resource and Hydropower Design and Research Institute of Gansu, Lanzhou730000, Gansu, China; 2. Headquarter of Armed Police Hydropower Troops, Beijing100055, China)
Abstract:The design of flip trajectory bucket is adopted for the project of Qingyanggou Hydropower Station with the project layout of 3 surface overflow bays and 1 discharging and flushing sluice. The downstream river bed of the project is quite narrow and the width is only about 20 m, and then the design of the energy dissipation and scouring protection is very difficult, furthermore, the requirement on the hydraulic characteristics of the flip trajectory bucket under various discharges is very high as well. In the original design, the flaring gate pier integrated with distorted type flip bucket is adopted; with which the slope toes of both the banks are directly scoured by the water flow from outlets of both the right and left surface bays with the scouring on the downstream river channel with a larger depth. Aiming at the problem of the scouring on both the banks with a larger scouring depth from the discharge in the original design, the shape of the flip bucket is optimized based on the hydraulic model test of the project, so as to make the layout of the flip bucket more safe and reasonable, thus satisfy the operation requirement concerned.
Keywords:Qingyanggou Hydropower Station  flip trajectory bucket  scouring  Shulehe River  
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号