谟武水电站砼围堰控制爆破拆除
作者单位:;1.闽江工程局
摘    要:通常采用控制爆破拆除砼围堰。本文介绍了谟武水电站砼围堰控制爆破拆除的经验,施工中解决了钻孔、装药、网路联接时出现的问题,爆破获得圆满成功,拆除砼6765m3。

关 键 词:控制爆破  围堰拆除

CONTROLLED BLASTING CONSTRUCTION FOR CONCRETE DAM OF MOWU HYDROPOWER STATION
Abstract:The controlled blasting is generally used for demolishing concrete damThe demolition experience of concrete dam of Mowu Hydropower Station by controlled blasting is introduced in this paperThe problems occurred in drilling,charging,net connection in construction have been solvedThe demolition blasting of this concrete dam has got successTotally 6765m3 concrete has been demolished
Keywords:Controlled blasting Dam removal