宁德核电站大面积爆破挤淤施工技术应用 |
| |
作者单位: | ;1.中国核工业华兴建设有限公司 |
| |
摘 要: | 以宁德核电站海域软基处理工程为例,介绍了大面积爆破挤淤技术的工艺原理、施工流程、参数选取和过程控制。本工程以爆炸置换法原理为基础,通过爆炸和抛填加载实现大面积深层淤泥置换,完成近27万m2淤泥质软基处理,爆破挤淤效果良好。
|
关 键 词: | 大面积 爆破挤淤 爆炸置换法 海域软基处理 |
APPLICATION OF CONSTRUCTION TECHNOLOGY OF THE NINGDE NUCLEAR POWER PLANT LARGE AREA OF BLASTING OOZE TREATMENT |
| |
Affiliation: | ,China Nuclear Industry Huaxing Construction Co.,Ltd. |
| |
Abstract: | Taking Ningde nuclear power station soft foundation treatment project as an example,the process principle,a large area of blasting ooze treatment method construction process,parameters and process control were introduced.Based on the principle of explosive replacement method,through explosions and fill loading large area deep silt replacement,soft foundation treatment of nearly 270000square meters of silt were completed,and the effect of silt removal by blasting was good. |
| |
Keywords: | Large area Mud displacement by blasting Displacement method by blasting Sea area soft foundation treatment |
|
|