三峡水利枢纽一期工程的土石方开挖 |
| |
作者单位: | ;1.中国长江三峡工程开发总公司 |
| |
摘 要: | 本文介绍了三峡水利枢纽一期工程土石方开挖的概况。针对其施工特点,介绍了所采用的一般技术措施;探讨了土石方开挖的主要技术问题,并提出作者的见解。
|
关 键 词: | 三峡水利枢纽,土石方开挖 |
EARTH AND ROCK EXCAVATION IN FIRST PHASE OF CONSTRUCTION OF THREE GORGES PROJECT |
| |
Affiliation: | ,Zhang Baosheng(China Yangtze River Three Gorges Project Development Corporation,Hubei,443002) |
| |
Abstract: | The general situation about the earth and cock excavation in first phase of construction of the Three Gorges Project is introduced in this paper.The general technical measures according to the excavative construction characteristics are described.The main problems of the earth and rock excavation is discussed and the writer's opinions put forward. |
| |
Keywords: | Three Gorges Project Earth and rock excavation |
|