首页 | 本学科首页   官方微博 | 高级检索  
     

150m高钢筋混凝土烟囱定向爆破拆除
作者单位:;1.贵州新联爆破工程集团有限公司
摘    要:介绍了成功将150m钢筋混凝土烟囱进行爆破拆除的案例。针对待爆破烟囱周围环境特点制定了爆破设计方案,采用了加大爆破切口高度,全部瞬发起爆及簇联复式网路以及安全防护措施。烟囱倒塌长度165.3m,倒塌方向前冲距离约为烟囱高度的10%,在爆破以及烟囱下坐、倒塌触地过程中振动速度最大值为0.10cm/s,需保护建(构)筑物和设施完好无损。取得了定向准确、倾倒落地安全、爆破振动控制好的经验,可为类似爆破工程提供参考。

关 键 词:烟囱  钢筋混凝土  定向爆破  爆破拆除  安全措施  爆破振动

Blasting demolition of 150m high reinforced concrete chimney
Affiliation:,Guizhou Xinlian Blasting Engineering Co.,Ltd.
Abstract:The blasting of 150 mreinforced concrete chimmey successfully was introduced.The blasting design was made according to the environmental characteristics of the chimney.The height of blasting cut was increased,and all instantaneous detonation and cluster compound network and safety protection measures were used.The collapse length of the chimney was165.3m,the collapsed distance along the collapse direction was 1/10 of the chimney height.Under the blasting,the peak velocity of the collapsed vibration was 0.10cm/s,and the protection of the building/structures and facilities were in good condition.This blasting made orientation accurately,the experience of dumping ground safety and the controlling of good blasting vibration had been obtained,which could provide a reference for similar blasting engineerings.
Keywords:Chimney  Reinforced concrete  Directional blasting  Blasting demolition  Security measure  Blasting vibration
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号