大埔水电站一期导流工程高喷灌浆施工
引用本文:莫汉文. 大埔水电站一期导流工程高喷灌浆施工[J]. 广西水利水电, 1996, 0(2): 59-62
作者姓名:莫汉文
作者单位:广西水电工程局大埔分局
摘    要:介绍广西首次大范围使用高喷灌浆对大埔水电站工程一期导流围堰强透水性的砂孵石层基础进行防渗处理的施工程序和高喷灌浆工艺

关 键 词:水电站  砂卵石防渗  高喷灌浆施工

Construction of overhead grouting in Ist stage diversion Project of the Dapu hydropower station
Mo Hanwen Dapu Branch of Guangxi Hydropower Construction Bureau,Liucheng. Construction of overhead grouting in Ist stage diversion Project of the Dapu hydropower station[J]. Gx Water Resources & Hydropower Engineering, 1996, 0(2): 59-62
Authors:Mo Hanwen Dapu Branch of Guangxi Hydropower Construction Bureau  Liucheng
Affiliation:Mo Hanwen Dapu Branch of Guangxi Hydropower Construction Bureau,Liucheng,545200
Abstract:This paper introduces the construction procedure and technology of overhead grouting for seepage prevention to the strong pervious,sandy gravel base of Dapu hy dropower station.It's firstly,large scoped using overhead grouting in Guangxi.
Keywords:hydropower station  sandy gravel  seepage prevention  overhead grouting  construction  