首页 | 本学科首页   官方微博 | 高级检索  
     

船闸人字门安装
引用本文:欧阳运华,王定苍,卢萍.船闸人字门安装[J].人民长江,2002,33(Z1).
作者姓名:欧阳运华  王定苍  卢萍
作者单位:OUYANG Yun-huaSenior Engineer,Three Gorges Project Command of Armed Police Hydropower Engineering Troops,Yichang 443133,China WANG Ding-cangSenior Engineer,Three Gorges Project Command of Armed Police Hydropower Engineering Troops,Yichang 443133,China LU PingSenior Engineer,Three Gorges Project Command of Armed Police Hydropower Engineering Troops,Yichang 443133,China
摘    要:1 IntroductionThemitergatesofTGPpermanentshiplocksarethelargesteverbuiltintheworld ,withunprecedentedgatesizesandweights.Thegateheightis 38.5m .Thesinglegateleafis 838.1tinweight.Thegeneralerectionprocesswasasfollows:locationsurvey→installationofembeddedparts…


On Erection of Shiplock Miter Gate
OUYANG Yun-hua,WANG Ding-cang,LU Ping.On Erection of Shiplock Miter Gate[J].Yangtze River,2002,33(Z1).
Authors:OUYANG Yun-hua  WANG Ding-cang  LU Ping
Abstract:The extreme large miter gates of TGP permanent shiplock are of great difficulty in erection,in view of the stringent requirement of precision control and the complicated components.The major erection problems,such as the erection measurement control, the selection of erection position of gate leaf,welding and deformation manipulation,the erection of back tie rods,the installation of apex pintle and prestressing anchorages,etc., had been carefully deliberated, and the optimized approaches were adopted.The erection practice of the miter gate at No.1 lock head shows that the adopted erection technology is safe,reliable and effective, and it may be used for reference for similar miter gates.
Keywords:erection of miter gate  measurement control  shipment and handling  welding deformation control  permanent shiplock  Three Gorges Project
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号