摘    要:介绍了江口水电厂进水口栏污栅下横梁断裂情况及修复方案的确定,着重叙述了栏梁的修复施工过程。水工建筑水下修复处理很困难,江口水电厂采用PBM-3聚合物混凝土施工,取得了良好的效果,可供同类水工建筑物的修复借鉴。

关 键 词:进水闸  PBM-3聚合物混凝土  栏污栅  横梁  断裂
文章编号:1006-348X(2005)05-09-02
收稿时间:2005-07-15
修稿时间:2005-07-15

Under - Crossbeam Breaking Treatment of No. 3 Trashrack on Water Inlet in Jiangkou Hydropower Station
Wang Yong-gang,Xie Xiao-gang.Under - Crossbeam Breaking Treatment of No. 3 Trashrack on Water Inlet in Jiangkou Hydropower Station[J].Jiangxi Electric Power,2005,29(5):9-10,15.
Authors:Wang Yong-gang  Xie Xiao-gang
Abstract:It's very difficult to treat dams underwater.In Jiangkou project,P BM-3 polymer concrete has been adopted to repair the breaked under-crossbeam of the inlet.
Keywords:intake gate  PBM - 3 polymer concrete  trashraek  cross beam  breaking