古浪河大桥钢梁现浇混凝土结合梁拖拉施工
引用本文:李秀钊. 古浪河大桥钢梁现浇混凝土结合梁拖拉施工[J]. 山西建筑, 2005, 31(4): 84-85
作者姓名:李秀钊
作者单位:中铁三局,山西太原03000l
摘    要:结合古浪河大桥钢梁工程实例,就其钢梁总体施工方案的布置进行了介绍,从钢梁拼装、上下滑道布置、拖拉架设施工等方面,阐述了具体的施工工艺措施,并总结了结合梁拖拉的施工体会。

关 键 词:现浇混凝土  结合梁  拖拉
文章编号:1009-6825(2005)04-0084-02
修稿时间:2004-12-08

Pulling construction of steel-concrete composite beam of Gulanghe bridge
LI Xiu-zhao. Pulling construction of steel-concrete composite beam of Gulanghe bridge[J]. Shanxi Architecture, 2005, 31(4): 84-85
Authors:LI Xiu-zhao
Abstract:Taking the steel beam work of Gulanghe bridge as example the arrangement of general construction plan is introduced from steel beam assembly, pulling and erection construction and other aspects. Concrete technical measures are presented as well as construction experiences of steel-concrete composite beam.
Keywords:cast-in-site concrete   steel-concrete composite beam   pulling