首页 | 本学科首页   官方微博 | 高级检索  
     

长大现浇箱梁跨铁路支架施工方案
引用本文:牛丽,聂东升.长大现浇箱梁跨铁路支架施工方案[J].山西建筑,2010,36(7):283-284.
作者姓名:牛丽  聂东升
作者单位:中铁电气化局西安铁路建设公司,陕西,咸阳,712000
摘    要:介绍了宝天高速公路BT5标新庄渭河大桥长大现浇箱梁跨陇海线支架施工总体方案,并对支架承载力进行检算,通过检算验证其承载力符合要求,从而保证既有线设备和施工安全。

关 键 词:现浇箱梁  跨铁路支架  施工方案  承载力

Construction scheme of cast-in-place boxed beam railway supporting
NIU Li,NIE Dong-sheng.Construction scheme of cast-in-place boxed beam railway supporting[J].Shanxi Architecture,2010,36(7):283-284.
Authors:NIU Li  NIE Dong-sheng
Affiliation:NIU Li NIE Dong-sheng
Abstract:This paper introduces the general construction scheme of cast-in-place boxed beam railway supporting across Longhai railway in BT5 section Xinzhuang Weihe Bridge on Bao-Tian expressway,and carries out the testing and calculation of the supporting load capacity,the result of which meets the requirements,guaranteeing the existing line equipments and construction's safety.
Keywords:cast-in-place boxed beam  cross railway supporting  construction scheme  load capacity  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号