摘    要:针对磨滩水电站大坝工程设计与施工过程中存在的一些问题与困难,借鉴下马岭水电站拦河坝等已建项目的成功经验,提出适宜磨滩水电站大坝的设计方案,并依此总结归纳出在软弱基础上修建重力坝工程的技术难点与方案选择建议。

关 键 词:软基重力坝设计  技术问题  方案选择  磨滩水电站  

Technical problems and scheme selection in soft foundation of gravity dam design
ZHANG Lei. Technical problems and scheme selection in soft foundation of gravity dam design[J]. Journal of water resources and water engineering, 2011, 22(1)
Authors:ZHANG Lei
Affiliation:ZHANG Lei (Shanxi Water Resources and Hydropower Construction Superviision Company,Taiyuan 030002,China)
Abstract:Aim at some problems and difficulties in the process dam engineering design and construction of motan hydropower station,using the successful experiences of built projects such as the Xiamaling Hydropower Station for reference,some suitable design scheme was proposed.Thereby some techinical problem and sheme selection suggestions have been summed up for gravity dam construction on soft foundations.
Keywords:gravity dam design on soft foundation  technical problems  scheme selection  Motan hydropower station  