后张法50 m T梁预制及跨既有线架设施工技术
引用本文:罗樊.后张法50 m T梁预制及跨既有线架设施工技术[J].山西建筑,2007,33(28):330-331.
作者姓名:罗樊
作者单位:中铁十一局集团建筑安装工程有限公司,湖北,襄樊,441057
摘    要:结合工程实例,介绍了冶河大桥后张法预应力混凝土50 m简支T梁制作及跨既有线架梁施工过程及技术要点,对以后同类型的桥梁跨既有线冬季施工具有借鉴意义.

关 键 词:预应力  后张法  制梁  架梁  既有线
文章编号:1009-6825(2007)28-0330-02
修稿时间:2007-04-24

Construction technology of the prefabrication of post-tensioned 50 m T-type beam and its erection crossing established line
LUO Fan.Construction technology of the prefabrication of post-tensioned 50 m T-type beam and its erection crossing established line[J].Shanxi Architecture,2007,33(28):330-331.
Authors:LUO Fan
Abstract:Combined with practical engineering, the author introduces construction process and technological dements of the prefabrication of 50 m post-tensioned pre-stressed simple-supported concrete T-type beam of Yehe Bridge and its erection crossing established line, which to offer a reference for similar construction of bridge crossing established line in winter.
Keywords:presrress  post-tensioned method  prefabrication  erection of beam  established beam