首页 | 本学科首页   官方微博 | 高级检索  
     

龙口工程施工期大坝监测分析
引用本文:宋涛,焦昊. 龙口工程施工期大坝监测分析[J]. 中国农村水电及电气化, 2013, 0(6): 6-8,5
作者姓名:宋涛  焦昊
作者单位:黄河万家寨水利枢纽有限公司,山西太原030002
摘    要:本文结合龙口水利枢纽施工期大坝监测的具体情况,通过对坝体温度监测资料和开合度监测资料的分析,评价了大坝在施工期的工作性态,为龙口水利枢纽的建设和运行提供了保障。

关 键 词:大坝监测  温度  开合度  龙口水利枢纽

Analysis of Dam Monitoring During Longkou Project Construction Period
SONG Tao,JIAO Hao. Analysis of Dam Monitoring During Longkou Project Construction Period[J]. Rural Hydropower & Electrification in China, 2013, 0(6): 6-8,5
Authors:SONG Tao  JIAO Hao
Affiliation:( Yellow River Wanjiazhai Water Control Pivot Co. , Ltd. , Taiyuan of Shanxi, 030002, China)
Abstract:In this paper, based on the specific circumstances of dam monitoring during Longkou Hydro-junction construction period, the working state of the dam during the construction period is evaluated through analyzing dam temperature monitoring data and opening degree monitoring data, thereby providing guarantee for Longkou Hydro-junction construction and operation.
Keywords:dam monitoring  temperature  opening degree  Longkou Hydro-junction
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号