首页 | 本学科首页   官方微博 | 高级检索  
     


Joint production and maintenance strategy for economic production quantity model with imperfect production processes
Authors:Gwo-Liang Liao
Affiliation:1. Department of Information Science and Management Systems, National Taitung University, 684 Chunghua Rd., Sec. 1, Taitung, Taiwan, ROC
Abstract:In this study, an economic production quantity (EPQ) model is generalized by considering maintenance and production programs for an imperfect process involving a deteriorating production system with increasing hazard rate. There are two types of preventive maintenance (PM), namely imperfect PM and perfect PM. The probability that perfect PM is performed depends on the number of imperfect maintenance operations performed since the last renewal cycle. Following a failure, the delayed repair performs some restorations and reduces production rate to restore the system into an operating state (in-control state), but leaves its lower production rate until perfect PM is performed. That is, the production run period not always starts in normal production rate. This study considers backorders, as well as loss of inventory due to the lower production rate. For the EPQ model, the optimum run time, which minimizes the total cost, is discussed. Various special cases are considered, including the maintenance learning effect. Finally, a numerical example is presented to illustrate the effects of PM ability, repair cost and production decreasing rate on total costs and production period.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号