首页 | 本学科首页   官方微博 | 高级检索  
     

引江济汉(项目区)设计洪水计算分析
引用本文:胡才宽,何美珍.引江济汉(项目区)设计洪水计算分析[J].湖北水力发电,2006(4):14-16.
作者姓名:胡才宽  何美珍
作者单位:湖北省水利水电勘测设计院,湖北武汉430070
摘    要:由于引江济汉工程区域内河流缺乏径流资料,采用暴雨资料来计算设计洪水。经合理性论证后认为,设计暴雨与设计洪水成果合理可靠,满足本阶段引江济汉干渠设计需要。

关 键 词:引江济汉  设计洪水  综合单位线  交叉河流  拾桥河
收稿时间:2006-06-10
修稿时间:2006-06-10

Calculational Analysis of Regional Design Flood for Yangtze River to Hanjiang River Water Diversion Project
HU Caikuan HE Meizhen.Calculational Analysis of Regional Design Flood for Yangtze River to Hanjiang River Water Diversion Project[J].Hubei Water Power,2006(4):14-16.
Authors:HU Caikuan HE Meizhen
Abstract:As it is deficient in runoff data in region of Yangtze River to Hanjiang River Water Diversion Project, so the regional design flood is calculated in accordance with rainstorm data in this area, the reliability of calculated result of design rainstorm and design flood is demonstrated by reasonalbility analysis and is affirmable to meet the design specification of main diversion canal in present stage.
Keywords:design flood  synthetic unit hydrography  cross river  Shiqiao River  Yangtze River to Hanjiang River Water Diversion Project
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号