首页 | 本学科首页   官方微博 | 高级检索  
     

山秀水电站施工期外部变形观测
引用本文:陈晓云. 山秀水电站施工期外部变形观测[J]. 广西水利水电, 2008, 0(3): 69-71
作者姓名:陈晓云
作者单位:南宁市广能凯星工程咨询有限公司,广西,南宁,530022
摘    要:结合山秀水电站工程的实际情况,介绍了电站永久建筑物施工期外部观测的观测内容、观测方法与技术要求、观测仪器的安装和埋设、及观测资料的整编、分析方法。

关 键 词:水工建筑物  施工期  外部变形观测  山秀水电站

External deformation monitoring during construction period of Shanxiu HPP
CHEN Xiao-yun. External deformation monitoring during construction period of Shanxiu HPP[J]. Gx Water Resources & Hydropower Engineering, 2008, 0(3): 69-71
Authors:CHEN Xiao-yun
Abstract:Combined with the actual conditions of Shanxiu Hydropower project,the author introduced the external monitoring for the permanent structures during construction period,including the monitoring contents,methods,technical requirements,installation and embedment of monitoring apparatus,compiling of monitoring data and analysis methods.
Keywords:Hydraulic structure  construction period  external deformation monitoring  Shanxiu Hydropower Plant
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号