首页 | 本学科首页   官方微博 | 高级检索  
     

水布垭地下厂房施工开挖的数值模拟
引用本文:王小平. 水布垭地下厂房施工开挖的数值模拟[J]. 山西建筑, 2006, 0(23)
作者姓名:王小平
作者单位:河海大学土木工程学院
摘    要:采用三维快速拉格朗日法在两种工况下对水布垭地下主厂房洞室的开挖与支护过程进行了模拟计算,重点研究了复杂地质条件下主厂房洞室开挖的变形形态、应力状态以及塑性区的分布,并对无支护和考虑支护两种工况的模拟结果进行了具体的分析比较,为工程施工提供了依据。

关 键 词:水布垭工程  地下厂房  数值模拟

Numerical simulation of the underground cavern in Shuibuya project
WANG Xiao-ping. Numerical simulation of the underground cavern in Shuibuya project[J]. Shanxi Architecture, 2006, 0(23)
Authors:WANG Xiao-ping
Affiliation:WANG Xiao-ping
Abstract:The excavation and support process of underground cavern of the Shuibuya project are simulated by three-dimensional fast lagrangian method in the two conditions.The pattern of deformation caused by excavation and the stability of surround rocks under complex geological condition are studied.The distribution of stress state and plastic areas are researched.In addition,the simulation results are compared in the two condition.
Keywords:Shuibuya project  underground houses  numerical simulation
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号