谈高铁隧道穿越严重湿陷性黄土地层地基处理
引用本文:翟文华. 谈高铁隧道穿越严重湿陷性黄土地层地基处理[J]. 山西建筑, 2010, 36(24): 343-344
作者姓名:翟文华
作者单位:北京中铁瑞威基础工程有限公司,北京,100055
摘    要:从湿陷性黄土的定义入手,结合工程实侧,并根据其地质条件和施工环境提出了相应的处理方案和检测办法,通过试验验证得出处理方案可行且能满足基底要求和隧道暗挖区的施作要求。

关 键 词:高速铁路  隧道工程  湿陷性新黄土  水泥土挤密桩

Exploration on the treatment of the high-speed railway tunnel through serious collapsible loess soil base
ZHAI Wen-hua. Exploration on the treatment of the high-speed railway tunnel through serious collapsible loess soil base[J]. Shanxi Architecture, 2010, 36(24): 343-344
Authors:ZHAI Wen-hua
Affiliation:ZHAI Wen-hua
Abstract:From the definition of the collapsible loess soil, combining with engineering practice, and according to its geological conditions and construction environment, it puts forward the corresponding processing program and testing methods. The experimental results obtain that treatment is not only feasible but also can meet the tunnel base requirements and construction requirement of undermining tunnel district.
Keywords:high-speed railway   tunnel engineering   new collapsible loess soil   cement-soil compaction pile