有色金属冶炼EPC总承包项目的界面管理
引用本文:武永琦.有色金属冶炼EPC总承包项目的界面管理[J].金属材料与冶金工程,2014(3):57-62.
作者姓名:武永琦
作者单位:中国恩菲工程技术有限公司,北京海淀100038
摘    要:从理论上对界面管理进行分析,针对EPC工程总承包的多阶段、多专业深度交叉以及参与单位较多等特点,重点研究EPC总承包项目界面管理的方法,并详细介绍了某大型有色金属冶炼EPC总承包项目控制和管理项目界面的实践和经验。

关 键 词:界面管理  工程总承包  工程应用

Interface Management of EPC General Contract Project of Non-ferrous Metal Smelting
Affiliation:WU Yong- qi (Chinese ENFI Engineering Technology Co., Ltd, Beijing 100038, China)
Abstract:An analysis was carried out on the interface management theory. In view of the features of EPC general contract project such as multi-stage, multi-disciplinary deep cross and multi-participant, the investigation focused on the interface management method for EPC general contract project. An introduction was made to the practice and experience of interface control and management of a large-scale EPC general contract project of non-ferrous metal smelting.
Keywords:interface management  general contract  engineering application