首页 | 本学科首页   官方微博 | 高级检索  
     

宣钢焦化厂10KV供配电系统升级改造
引用本文:张爱萍. 宣钢焦化厂10KV供配电系统升级改造[J]. 河北建筑工程学院学报, 2009, 27(1): 85-87
作者姓名:张爱萍
作者单位:宣钢焦化厂自动化车间
摘    要:因实施张家口市城市煤气气源工程,根据整体规划,需要拆除10KV配电室,配电室内成套的高压配电设施是2003年投入运行的,为节省投资,我们对拆除的配电设施进行升级扩展,以满足供电系统、生产工艺和生产用电设备的需要.

关 键 词:开关柜控制系统的完善  PT柜的升级  双电双充的改进

On the 10KV Power Supply System Upgradation
Zhang Aiping. On the 10KV Power Supply System Upgradation[J]. Journal of Hebei Institute of Architectural Engineering, 2009, 27(1): 85-87
Authors:Zhang Aiping
Affiliation:Zhang Aiping (Automation Workshop,Xuanhua Coking factory)
Abstract:Because the coal gas project will be implemented,the 10KV compound electricity room needs to be pulled down.The high-pressure compound electricity equipment were put into operation in 2003.In order to save money,we decided to upgrade the equipment which was dismantled,so as to satisfy the need of producing techniqne and electric equipment in electric system.
Keywords:perfectation of switch controlling system  upgradation of PT Ark  improvement of double-charger equipment
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号