首页 | 本学科首页   官方微博 | 高级检索  
     

除尘系统管路的设计与调整
引用本文:庄凌云,陈满科. 除尘系统管路的设计与调整[J]. 中国矿山工程, 2002, 31(4): 44-46
作者姓名:庄凌云  陈满科
作者单位:1. 山西铝厂,山西,河津,043300
2. 北京恩菲科技产业集团,北京,100038
摘    要:管路是除尘系统的“动脉” ,本文对其设计和现场调整方法进行了探讨。

关 键 词:除尘系统  管路设计  调整
文章编号:1002-8951(2002)04-0044-03
修稿时间:2002-05-28

Design and adjustment of pipeline in dust collection system
ZHUANG Ling yun ,CHEN Man ke. Design and adjustment of pipeline in dust collection system[J]. China Mine Engineering, 2002, 31(4): 44-46
Authors:ZHUANG Ling yun   CHEN Man ke
Affiliation:ZHUANG Ling yun 1,CHEN Man ke 2
Abstract:Pipeline is the artery of dust collection system. In this paper, its design and adjustment method are discussed.orm deep basin gas traps,whereas it was found that some superimposed basins compounded with foreland basins and cratonic basins in the middle and western China can meet the needs for forming deep basin gas traps. It is thought to be exploration zones the upper Paleozoic in E'erduosi Basin. The signs of deep basin gas traps were also found in the Triassic in western foreland basins of Sichuan Basin.And those potential exploration zones will be the foreland basins in Kuce and the southern Zhunge'er. SUBJECT HEADINGS:Deep Basins,Natural gas,Exploration evaluation,Exploration principle,Foreland basin,Cratonic,Rift basin,China
Keywords:dust collection system  pipeline design  adjustment  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号