汽轮发电机组加热器管道系统设计问题及改进
引用本文:周雪鹿,范乃春,姚群. 汽轮发电机组加热器管道系统设计问题及改进[J]. 冶金动力, 2011, 0(3): 48-49,51
作者姓名:周雪鹿  范乃春  姚群
作者单位:中冶华天工程技术有限公司,安徽马鞍山,243005
摘    要:泰国NTS公司12 MW高炉煤气电站调试时,汽轮发电机组加热器管道系统出现了问题,对此进行了分析诊断,讨论了汽轮发电机组管道系统设计中存在的问题,并提出了改进的方案。

关 键 词:汽轮发电机组  加热器疏水管道  除氧器补水管道

Problems and Improving Measures in Design of Heater Piping System of Turbo-unit
ZHOU Xue-lu,FAN Nai-ehun,YAO Qun. Problems and Improving Measures in Design of Heater Piping System of Turbo-unit[J]. Metallurgical Power, 2011, 0(3): 48-49,51
Authors:ZHOU Xue-lu  FAN Nai-ehun  YAO Qun
Affiliation:ZHOU Xue-lu,FAN Nai-chun,YAO Qun(Huatian Engineering & Technology Corporation,MCC,Maanshan,Anhui 243005,China)
Abstract:The problems occurred in the heater piping system of turbo-unit during commissioning of the 12 MW BF gas power plant project for NTS in Thailand.The problems in design of the piping system of turbo-unit are discussed,and improving measures are put forward.
Keywords:turbo-unit  heater drainage pipe  water make-up pipe of deaerator  