首页 | 本学科首页   官方微博 | 高级检索  
     

山区污水处理厂平面及竖向设计优化
引用本文:杨玉梅.山区污水处理厂平面及竖向设计优化[J].净水技术,2008,27(4).
作者姓名:杨玉梅
作者单位:上海市政工程设计研究总院,上海,200092
摘    要:以重庆鸡冠石污水处理厂为例,介绍了在高差较大的山区地形地貌基础上污水厂竖向设计的优化方法。利用数学模拟分析的方法进行土石方平衡,获得最佳竖向设计目标;按照优化的结果考虑阶梯式的平面及竖向布置,实现了工程投资和实施效果的最优。

关 键 词:污水厂竖向设计  土石方平衡  设计优化

Optimization on the Layout and Vertical Design of Wastewater Treatment Plant in the Mountain Area
YANG Yu-mei.Optimization on the Layout and Vertical Design of Wastewater Treatment Plant in the Mountain Area[J].Water Purifcation Technology,2008,27(4).
Authors:YANG Yu-mei
Abstract:Optimization method for the wastewater treatment plant (WWTP) layout and vertical design based on topography in the mountain area was introduced in this paper taking chongqing jiguanshi WWTP as an example. The optimal vertical design target in the balance of earthworks has been obtained by the use of a mathematic modeling analysis. According to the analysis, the lad-type layout and vertical design was adopted. As a result, the project investment and implementation were optimized.
Keywords:vertical design of WWTP balance of the earthworks design optimization
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号