首页 | 本学科首页   官方微博 | 高级检索  
     

TBM隧道综合超前地质预报及其在阳灵隧道的应用
引用本文:刘俊,韩立军,孟庆彬.TBM隧道综合超前地质预报及其在阳灵隧道的应用[J].山东大学学报(工学版),2006,49(4):51-60.
作者姓名:刘俊  韩立军  孟庆彬
作者单位:1. 中国矿业大学深部岩土力学与地下工程国家重点实验室, 江苏 徐州 221116
2. 中国矿业大学力学与土木工程学院, 江苏 徐州 221116
基金项目:国家自然科学基金资助项目(51574223);国家自然科学基金资助项目(51704280);中国博士后科学基金资助项目(2017T100420);中国博士后科学基金资助项目(2015M580493)
摘    要:超前地质预报对于实现隧道施工的信息数据化,灾害防治的有效化,施工支护的经济化等方面具有不可代替的作用。对比分析钻爆法中的超前地质预报方法在隧道掘进机(tunnel boring machine, TBM)特定的施工环境下使用的有效程度,提出综合“长短距离、物探钻探、声波电磁、重点平时”的TBM隧道施工下的超前地质预报体系的构想,并基于水平声波剖面法(horizontal sonic profiling, HSP)声波反射法、钻孔过程监测系统(drilling process monitoring, DPM)超前钻探、瞬变电磁仪等方法,利用三维正演计算的理论研究,进而压制了单一超前地质预报方法的多解性和误差叠加性,从而提高预报的精确度和可靠性。基于本研究的电磁响应规律以及去除电磁干扰研究,指导宜兴阳灵隧道瞬变电磁法的实际工程应用,并对预报结果进行总结对比,从而为今后工程提供借鉴参考。

关 键 词:超前地质预报体系  TBM施工  HSP声波反射法  DPM超前钻探  
收稿时间:2018-03-07

TBM comprehensive advanced geological prediction in a tunnel andits application in Yangling Tunnel
Jun LIU,Lijun HAN,Qingbin MENG.TBM comprehensive advanced geological prediction in a tunnel andits application in Yangling Tunnel[J].Journal of Shandong University of Technology,2006,49(4):51-60.
Authors:Jun LIU  Lijun HAN  Qingbin MENG
Affiliation:1. State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116, Jiangsu, China
2. School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, Jiangsu, China
Abstract:Advanced geological prediction was used to play an irreplaceable role in the aspect of informative tunnel construction, effective disaster prevention, economical construction support in tunnel engineering. The effectiveness of the advanced geological prediction method in the drilling and blasting method under the tunnel boring machine (TBM) specific construction environment was compared and analyzed. The comprehensive advanced geological prediction system under TBM tunnel construction with "long and short distance, geophysical and drilling exploration, sound wave reflection and electromagnetic method, key and normal" was established. Based on the horizontal sonic profiling (HSP) sound wave reflection, drilling process monitoring (DPM) advanced drilling, transient electromagnetic instrument, the multiple solutions and error superposition of single advanced geological prediction method were suppressed effectively. And then the 3D forward theory calculation was considered as an appropriate way for enhancing the accuracy and reliability. Based on the law of electromagnetic response and the study of removing electromagnetic interference, the results summarized from the paper were used to guide the application of transient electromagnetic method in Yixing Yangling Tunnel and to provide a reference for future projects.
Keywords:advanced geological prediction system  TBM construction  HSP sound wave reflection method  automatic drilling process monitoring  
点击此处可从《山东大学学报(工学版)》浏览原始摘要信息
点击此处可从《山东大学学报(工学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号