潮汐电站浮运法施工技术综述
引用本文:范波芹,索丽生.潮汐电站浮运法施工技术综述[J].水利水电科技进展,1998,18(6):17-20.
作者姓名:范波芹  索丽生
作者单位:河海大学
摘    要:在潮汐电站建设中,浮运法施工起着降低造价,缩短工期,改善施工条件等重要作用。本文简要介绍潮汐电站浮运法施工各阶段(预制,拖运,地基处理,沉放)的关键技术,包括选择预制场,控制拖运,开挖和地基加固,定位和安放沉箱等。浮运法施工技术在河床式水电站、码头、海上采油平台、过江(海底)隧道、桥梁、水闸等工程中也有广泛的应用前景。

关 键 词:潮汐电站,浮运法,混凝土块体结构,沉箱,施工技术
修稿时间:2004/11/11 0:00:00

Floating caisson Construction Method of Tidal Power Plant
Fan Boqin,et al.Floating caisson Construction Method of Tidal Power Plant[J].Advances in Science and Technology of Water Resources,1998,18(6):17-20.
Authors:Fan Boqin  
Abstract:In the construction of tidal power plants,the floating caisson method may reduce the cost shorten the construction period,and improve construction conditions.This paper introduces briefly the crucial technology of the method including the selection of precasting yards,controlling of the towing,excavation and treatment of foundation,locating and placing of caissons.The floating caisson construction method can also be applied to river channel power stations,ports,offshore drilling platforms,subaqueous tunnels,bridges,locks,etc.
Keywords:tidal power plant  floating  caisson construction  concrete block  caisson  