首页 | 本学科首页   官方微博 | 高级检索  
     

中平水电站引水渡槽槽身砼施工
引用本文:苏相毅.中平水电站引水渡槽槽身砼施工[J].广西水利水电,2007(3):48-50.
作者姓名:苏相毅
作者单位:北海市大禹建设工程有限公司,广西,北海,536000
摘    要:中平水电站引水渡槽是广西目前最大的"U"型渡槽.分析了渡槽的特点,论述了槽身砼现浇的施工方法、工艺流程及要求,总结了施工中的质量控制要点,并对类似工程施工提出改进设想.

关 键 词:引水渡槽  砼施工  中平水电站
文章编号:1003-1510(2007)03-0048-03
收稿时间:2007-05-18
修稿时间:2007-05-18

Diversion flume body concrete construction for Zhongping HPP
SU Xiang-yi.Diversion flume body concrete construction for Zhongping HPP[J].Gx Water Resources & Hydropower Engineering,2007(3):48-50.
Authors:SU Xiang-yi
Affiliation:Beihai Dayu Construction Engineering Co. Ltd., Beihai 536000, China
Abstract:Zhongping Hydropower Plant has the largest U-type flume of present Guangxi. Based on an analysis of the characteristics of flume, the author introduced the construction method, work process and requirements of flume body concreting, surnmarized the key issues of construction quality control, and put forward improvement idea for construction of similar project.
Keywords:Diversion  flume  concrete construction  Zhongping Hydropower Plant(HPP)