首页 | 本学科首页   官方微博 | 高级检索  
     

十三陵蓄能电厂GIS设备的安装与调试
引用本文:吴张建.十三陵蓄能电厂GIS设备的安装与调试[J].水力发电,2002(9):19-21,41.
作者姓名:吴张建
作者单位:十三陵蓄能电厂,北京,102200
摘    要:十三陵蓄能电厂220kV开关站设备为瑞士ABB公司生产的ELK14型SF6气体绝缘开关组合装置(GIS)。根据GIS设备的技术参数、结构特点和安装工艺要求,在安装和调试过程中,采取了一些有效的措施,如:采用将部件组装成间隔的运输方式;改变原有GIS间隔基础的固定方式;严格控制变压器与GIS对接的误差;安装中注意保证工作面环境清洁;严防高压套管受潮等,取得了良好的效果,高质、高效地完成了安装调试工作。

关 键 词:十三陵蓄能电厂  GIS设备  安装  调试
文章编号:0559-9342(2002)09-0019-03

Installation and debugging of GIS equipment for the Shisanling Pumped-storage Power Plant
WU Zhang,jian.Installation and debugging of GIS equipment for the Shisanling Pumped-storage Power Plant[J].Water Power,2002(9):19-21,41.
Authors:WU Zhang  jian
Affiliation:Shisanling Pumped storage Power Plant
Abstract:The equipment for the 220 kV switch station of Shisanling Pumped storage Power Plant is an ELK14 SF 6 GIS made by ABB Company in Switzerland. In accordance with the technical parameters, structural characteristics and installation requirements of GIS, some effective measures have been taken in the installation and debugging, such as using the transportation way of assembling the parts with partition; changing the fixing way of original GIS partition base; controlling strictly the butt errors of transformer and GIS; ensuring the environment clearance of working surface during installation; and protecting strictly the high pressure casing pipe from getting damp. With these measures, good effectiveness has been gained and the work of installation and debugging has been completed with high quality and efficiency.
Keywords:GIS  installation  debugging  Shisanling Pumped  storage Power Plant
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号