复杂地质条件近接施工技术
引用本文:郭小华.复杂地质条件近接施工技术[J].山西建筑,2009,35(12):133-134.
作者姓名:郭小华
作者单位:中铁隧道集团三处有限公司,广东,深圳,518051
摘    要:以广州地铁2号线越秀公园站施工为例,开创了在复杂地质条件下的近接施工典型工程实例,通过力学模拟分析,就如何选择相应的施工方法和辅助工法,及监控量测反馈实施效果进行了分析总结,以期对类似工程提供借鉴。

关 键 词:近接施工  复杂地质条件  力学分析  施工方法

The close-spaced construction technology in complex geological condition
GUO Xiao-hua.The close-spaced construction technology in complex geological condition[J].Shanxi Architecture,2009,35(12):133-134.
Authors:GUO Xiao-hua
Affiliation:GUO Xiao-hua
Abstract:With Yuexiu park station of Guangzhou No.2 subway construction as example,which started a close-spaced construction typical engineering example in complex geological condition.Through mechanics modeling analysis,how to choose corresponding construction method and secondary construction method,monitoring measuring reflected implementing effect were analyzed and generalized,which hope to provide reference for similar engineering.
Keywords:close-spaced construction  complex geological condition  mechanics analysis  construction method  