首页 | 本学科首页   官方微博 | 高级检索  
     


Production schedule of concretes for maximum profit
Authors:S. Popovics
Affiliation:(1) Dept. of Civil Engineering, Drexel University, 19104 Philadelphia, PA, U.S.A.
Abstract:Three numerical examples illustrate both the types of profit problem related to concrete production that can be solved by linear programming, and several optimization techniques. It is shown that linear programming can provide not only the production schedule for maximum profit under a set of existing conditions but also it can point in the direction of the most efficient changes of the existing conditions for increased production and profit.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号