首页 | 本学科首页   官方微博 | 高级检索  
     

顶管施工地下对接施工工法
引用本文:董泽龙,徐刚,徐飞. 顶管施工地下对接施工工法[J]. 中国市政工程, 2008, 0(5)
作者姓名:董泽龙  徐刚  徐飞
作者单位:上海市第一市政工程有限公司,上海,200083
摘    要:顶管施工地下对接施工技术可解决超常规距离或不能布置工井的顶管施工难题。阐述了顶管施工地下施工技术的特点,施工工艺流程。总结归纳了施工关键技术及其质量要求,介绍了相关的施工劳动组织和机具设备概况。

关 键 词:非开挖技术  顶管施工地下对接技术  掘进机

Workmanship for Underground Butt Joining in Pipejacking Works
DONG Ze-long,XU Gang,XU Fei. Workmanship for Underground Butt Joining in Pipejacking Works[J]. China Municipal Engineering, 2008, 0(5)
Authors:DONG Ze-long  XU Gang  XU Fei
Affiliation:Shanghai No.1 Municipal Engineering Co. Ltd.;Shanghai 200083;China
Abstract:The technique for underground butt joining in construction by pipejacking can solve the problem of extra long distance driving or difficult to provide a shaft, and described hereby are features in underground pipejacking works and the workflow of construction, with a summary of the key techniques and their quality requirements, including a schedule of operation organization and the mechanic and electric plant.
Keywords:trenchless technology  underground butt joining for pipejacking  excavator  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号