900t运架一体机单孔架梁可行性研究
引用本文:段志刚.900t运架一体机单孔架梁可行性研究[J].山西建筑,2012,38(29):215-216.
作者姓名:段志刚
作者单位:中铁十二局集团第四工程有限公司,陕西西安,710021
摘    要:以铁路架梁为例,阐述了900 t运架一体机在架梁过程中遇到的单孔桥梁架设的施工方案的可行性研究,并对原理论方案和改进后的方案进行了论述,同时加以对比分析,从而为单孔桥梁架设提供更加合理的方案。

关 键 词:运架一体机  方案  可行性研究

Feasible research on single-hole erecting beam of 900 t integrated handling machine
DUAN Zhi-gang.Feasible research on single-hole erecting beam of 900 t integrated handling machine[J].Shanxi Architecture,2012,38(29):215-216.
Authors:DUAN Zhi-gang
Affiliation:DUAN Zhi-gang (No.4 Engineering Co.,Ltd,China Railway 12th Group,Xi’an 710021,China)
Abstract:By taking the railway erecting beam as the example,the paper illustrates the feasible research on the construction scheme for the single-hole erecting beam in the process of the erection of 900 t integrated handling machine,indicates the formal theoretic scheme and the one after some improvement,and undertakes the comparative analysis,so as to provide more reasonable scheme for the erection of the single-hole bridge.
Keywords:integrated handling machine  scheme  feasible research