首页 | 本学科首页   官方微博 | 高级检索  
     


Ground response to high horizontal stresses during longwall retreat and its implications for longwall headgate support
Affiliation:1. NIOSH, Pittsburgh Mining Research Division (PMRD), Pittsburgh, PA 15236, USA;2. Department of Mining Engineering, West Virginia University, Morgantown, WV 26505, USA
Abstract:Roof falls in longwall headgate can occur when weak roof and high horizontal stress are present. To prevent roof falls in the headgate under high horizontal stress, it is important to understand the ground response to high horizontal stress in the longwall headgate and the requirements for supplemental roof support. In this study, a longwall headgate under high horizontal stress was instrumented to monitor stress change in the pillars, deformations in the roof, and load in the cable bolts. The conditions in the headgate were monitored for about six months as the longwall face passed by the instrumented site.The roof behavior in the headgate near the face was carefully observed during longwall retreat.Numerical modeling was performed to correlate the modeling results with underground observation and instrumentation data and to quantify the effect of high horizontal stress on roof stability in the longwall headgate. This paper discusses roof support requirements in the longwall headgate under high horizontal stress in regard to the pattern of supplemental cable bolts and the critical locations where additional supplemental support is necessary.
Keywords:Longwall mining  Longwall headgate  High horizontal stress  Supplemental support
本文献已被 CNKI ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号