首页 | 本学科首页   官方微博 | 高级检索  
     

贯通工程加测陀螺定向边最佳位置的确定
引用本文:张国庆. 贯通工程加测陀螺定向边最佳位置的确定[J]. 江西煤炭科技, 2009, 0(3): 45-46
作者姓名:张国庆
作者单位:福建省龙岩学院,福建,龙岩,364000
摘    要:贯通工程必须有足够的测量精度,加测陀螺定向边可提高贯通精度已成为定论.根据求条件极值的拉格郎日乘数法推论在测量导线中加测陀螺定向边的最佳位置应在导线的等分处,加测的陀螺定向边以一至二条为宜.

关 键 词:贯通工程  测量精度  陀螺定向边  最佳位置

Determination of Optimum Position of Gyroscopic Directed Edge in Through Survey
Zhang Guoqing. Determination of Optimum Position of Gyroscopic Directed Edge in Through Survey[J]. Jiangxi Coal Science & Technology, 2009, 0(3): 45-46
Authors:Zhang Guoqing
Affiliation:Long yan Unirersity;Longyan;Fujian 364000
Abstract:Sufficient survey accuracy is essential to through suvey,which can be improved by measuring the gyroscopic directed edge.Lagrange Multiplicator Law used to evaluate the extremum with a condition infers that the optimum position of the gyroscopic directed edges(whose appropriate number is one to two) is at the bisector of surveyed traverse.
Keywords:through survey  survey accuracy  gyroscopic directed edge  optimum position  