首页 | 本学科首页   官方微博 | 高级检索  
     

南水北调中线一期工程丹江口大坝加高方案的论证与决策
引用本文:刘宁.南水北调中线一期工程丹江口大坝加高方案的论证与决策[J].水利学报,2006,37(8):899-905.
作者姓名:刘宁
作者单位:水利部,北京,100053
摘    要:丹江口水库是南水北调中线工程的水源地,大坝加高是关键性控制工程。本文从工程效益、移民、投资、经济、环保等方面对丹江口水库大坝加高方案进行了综合分析,选取主要影响因素,用多目标决策分析方法对加高方案进行了论证。通过对正常蓄水位170m方案和165m(加泵站)方案进行的模糊评价隶属度计算,得出170m方案较优的结论。

关 键 词:南水北调  丹江口水库  大坝加高  多目标决策方法  模糊评价  隶属度
文章编号:0559-9350(2006)08-0899-07
收稿时间:2/9/2006 12:00:00 AM
修稿时间:2006年2月9日

Study on heightening schemes of Danjiangkou Reservoir for first stage of Middle Route South-to-North Water Transfer Project
LIU Ning.Study on heightening schemes of Danjiangkou Reservoir for first stage of Middle Route South-to-North Water Transfer Project[J].Journal of Hydraulic Engineering,2006,37(8):899-905.
Authors:LIU Ning
Affiliation:Ministry of Water Resources, Beijing 100053, China
Abstract:The Danjiangkao Reservoir is the source providing the water of Middle Route South-to-North Water Transfer Project. The dam of the reservoir must be heightened to increase the storage capacity, In this paper the several heightening schemes are comprehensively analyzed from the aspects of benefit, resettlement, investment, economic development and environmental protection, The major factors affecting the decision making are selected and the schemes are studied by means of muhi-objective decision making analysis method, The contrast comparison between the scheme adopting the 170m as the normal top water level and the scheme adopting 165m as the normal top water level with a complementary pumping system is carried out by the method of calculating the fuzzy evaluation subordination levels. The conclusion of the former better than the latter is obtained.
Keywords:Middle Route South-to-North Water Transfer Project  Danjiangkou Reservoir  heightening scheme  muhi-objective decision making analysis  fuzzy evaluation  membership degree
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《水利学报》浏览原始摘要信息
点击此处可从《水利学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号