首页 | 本学科首页   官方微博 | 高级检索  
     

对河口水库除险加固工程砼防渗墙造价浅析
引用本文:厉莎,钱善扬. 对河口水库除险加固工程砼防渗墙造价浅析[J]. 浙江水利水电专科学校学报, 2004, 16(1): 45-47
作者姓名:厉莎  钱善扬
作者单位:浙江省水利水电勘测设计院,浙江,杭州,310002
摘    要:砼防渗墙在水库除险加固工程中发挥着重要作用,通过德清对河口水库除险加固工程的砼防渗墙的实例分析,对砼防渗墙造价进行浅析,提出一些建议和看法.

关 键 词:对河口水库除险加固工程  砼防渗墙  造价分析  砼浇注钻孔  工程造价
文章编号:1008-536X(2004)01-0045-03
修稿时间:2003-09-18

On Fabrication Cost of Concrete Impervions Core Wall of Risk Removal and Consolidation for Duhekou Reservoir
LI Sha,QIAN Shan-yang. On Fabrication Cost of Concrete Impervions Core Wall of Risk Removal and Consolidation for Duhekou Reservoir[J]. Journal of Zhejiang Water Conservancy and Hydropower College, 2004, 16(1): 45-47
Authors:LI Sha  QIAN Shan-yang
Abstract:Concrete impervions core wall plays an important role in risk removal and consolidation project for reservoir. The article talks about the fabrication cost of concrete impervions core wall through analyzing the detailed case of the concrete impervions core wall of risk removal and consolidation for Duhekou reservoir in Deqing.The author also puts up some suggestions and opinions.
Keywords:risk removal and onsolidation for Duhekou reservoir  concrete impervions core wall  fabrication cost analysis  concrete placing  borehole  fabrication cost of the project
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号