Abstract: | When the new Office Building for the United States Embassy in Moscow was in the final construction stage, visible defects caused work on the building to be suspended; a detailed structural analysis was then carried out by the NBS Center for Building Technology. Its report highlights the problems that can arise both with a structural design — such as guarding against buckling and progressive collapse — and with the detailed execution of that design. |