首页 | 本学科首页   官方微博 | 高级检索  
     

深圳市公明污水处理厂工程设计
引用本文:赵国志.深圳市公明污水处理厂工程设计[J].中国市政工程,2010(1):34-37.
作者姓名:赵国志
作者单位:上海市政工程设计研究总院,上海,200092
摘    要:深圳市公明污水处理厂工程近期设计规模为10×104m3/d,远期为20×104m3/d,工艺流程采用多模式A2/O工艺,出水质量执行一级A标准。在工程设计中,借鉴了相关工程的设计经验,对各构筑物的设计参数进行了优化,并介绍了主要构筑物及设计参数。

关 键 词:污水处理厂  A2/O工艺  脱氮除磷  工程设计

On Design of Shenzhen Gongming Sewage Treatment Plants
ZHAO Guo-zhi.On Design of Shenzhen Gongming Sewage Treatment Plants[J].China Municipal Engineering,2010(1):34-37.
Authors:ZHAO Guo-zhi
Affiliation:ZHAO Guo-zhi(Shanghai Municipal Engineering Design & Research General Institute,Shanghai 200092,China)
Abstract:The recent design scale of Shenzhen Gongming Sewage Treatment Plants is 10 × 104 m3/d,while the future one is 20×104 m3/d.The multi-A2/O process is adopted and the outflow quality must meet Standard Class A.During the project design,thinking about relative projects experience,the design parameters of all structures are optimized and introduced briefly.
Keywords:sewage treatment works  A2/O process  denitrification and phosphorus removal  project design  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号