首页 | 本学科首页   官方微博 | 高级检索  
     

工程量清单计价模式下的工程造价控制与管理
引用本文:黄洁飞.工程量清单计价模式下的工程造价控制与管理[J].山西建筑,2012,38(27):259-260.
作者姓名:黄洁飞
作者单位:蔚县一建建筑工程有限责任公司,河北蔚县,075700
摘    要:分析了工程量清单计价模式的利与弊,针对如何做好工程量清单计价模式下的造价控制与管理进行了探讨,着重介绍了工程实施各阶段的造价控制与管理方法,提出在工程量清单计价模式下加强工程造价管理,具有十分重要的现实意义。

关 键 词:工程量清单计价  造价控制  设计阶段  施工阶段

Talking about the engineering cost control and management under the mode of bill of quantities
HUANG Jie-fei.Talking about the engineering cost control and management under the mode of bill of quantities[J].Shanxi Architecture,2012,38(27):259-260.
Authors:HUANG Jie-fei
Affiliation:HUANG Jie-fei(Weixian 1st Construction Engineering Co.,Ltd,Weixian 075700,China)
Abstract:The paper analyzes the advantages and disadvantages of bill of quantity,explores how to control and manage cost under the mode of bill of quantities,and mainly introduces the cost control and management methods at various engineering implementation phases,and finally puts out that has significant meaning for enhancing engineering cost management under the mode of bill of quantities.
Keywords:bill of quantities  cost control  design phase  construction phase
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号