首页 | 本学科首页   官方微博 | 高级检索  
     

MBBR工艺在采用氧化沟工艺的污水厂提标改造中的应用
引用本文:王晓康,杨欣,边靖,徐保祥. MBBR工艺在采用氧化沟工艺的污水厂提标改造中的应用[J]. 中国给水排水, 2020, 0(6): 55-59
作者姓名:王晓康  杨欣  边靖  徐保祥
作者单位:中国市政工程华北设计研究总院有限公司
摘    要:台州黄岩江口污水一期工程提标改造规模为8×104m3/d,本次工程将出水标准从《污水综合排放标准》(GB 8978—1996)二级标准提升至《城镇污水处理厂污染物排放标准》(GB18918—2002)一级A标准。提标核心目标为强化一期氧化沟的硝化、反硝化脱氮能力。在综合分析出水标准要求、氧化沟流态、硝化及反硝化过程的环境要求等因素后,确定氧化沟改造采用MBBR工艺,在池内采取了重新划分缺氧、好氧功能区,在好氧区投加填料,调整内回流泵参数,更改曝气方式等工程措施。工程运行结果表明,改造后运行成本降低,MBBR工艺能够达到设计出水标准,且对水质、水量冲击负荷具有良好的适应能力。

关 键 词:提标改造  氧化沟  MBBR

Application of MBBR Process in Upgrading and Reconstruction of Wastewater Treatment Plant(WWTP)with Oxidation Ditch Process
WANG Xiao-kang,YANG Xin,BIAN Jing,XU Bao-xiang. Application of MBBR Process in Upgrading and Reconstruction of Wastewater Treatment Plant(WWTP)with Oxidation Ditch Process[J]. China Water & Wastewater, 2020, 0(6): 55-59
Authors:WANG Xiao-kang  YANG Xin  BIAN Jing  XU Bao-xiang
Affiliation:(North China Municipal Engineering Design&Research Institute Co.Ltd.,Tianjin 300381,China)
Abstract:The design capacity of the upgrading and reconstruction project of the first phase of Huangyan Jiangkou wastewater treatment plant(WWTP)in Taizhou was 8×10^4 m^3/d.The effluent standard of this project was required to be enhanced from the second level of Integrated Wastewater Discharge Standard(GB 8978-1996)to the first level A standard of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002).The target of the upgrading and reconstruction project was to strengthen the nitrification and denitrification performance of the oxidation ditch in the first phase project.After the comprehensive analysis of the factors such as effluent standards,oxidation ditch flow state and the environmental requirements of nitrification and denitrification process,MBBR process was adopted for upgrading and reconstruction of the oxidation ditch process,engineering measures such as redividing the anoxic and oxic functional area,adding filler in aerobic area,adjusting the parameters of internal reflux pump parameters and changing aeration mode were adopted.The engineering operation results showed that the MBBR process could meet the design effluent standard and had good adaptability to the impact of water quality and water quantity.
Keywords:upgrading and reconstruction  oxidation ditch  MBBR
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号