首页 | 本学科首页   官方微博 | 高级检索  
     

滩海人工岛工程安全监测自动化系统研究
引用本文:焦志斌,冯京海,李凯双,王长军,李顺利,季宏.滩海人工岛工程安全监测自动化系统研究[J].水利水运工程学报,2013,0(1):66-70.
作者姓名:焦志斌  冯京海  李凯双  王长军  李顺利  季宏
作者单位:1.南京水利科学研究院水文水资源与水利工程科学国家重点实验室
摘    要:基于海上油气生产的人工岛安全性需要,提出了滩海人工岛工程运行期安全监测方法和技术要求,安全监测宜采用自动化系统.结合冀东油田1-3#人工岛工程运行期安全监测系统研究,在国内首次开发和建立了滩海人工岛工程安全监测自动化系统,实现了滩海人工岛实时自动监测、数据处理、信息发布和预警等.系统初步运行结果表明,1-3#人工岛工程运行期围堤存在明显的不均匀沉降,岛体存在体缩现象.研究成果为滩海人工岛工程运行期阶段的管理和维护提供了技术依据和保障,对滩海工程运行期的安全监测具有指导作用.

关 键 词:运行期    人工岛    安全监测    自动化系统    围堤

A study of an automatic monitoring system for artificial islands
JIAO Zhi-bin,FENG Jing-hai,LI Kai-shuang,WANG Chang-jun,LI Shun-li and JI Hong.A study of an automatic monitoring system for artificial islands[J].Hydro-Science and Engineering,2013,0(1):66-70.
Authors:JIAO Zhi-bin  FENG Jing-hai  LI Kai-shuang  WANG Chang-jun  LI Shun-li and JI Hong
Affiliation:1.State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Nanjing Hydraulic Research Institute2.PetroChina Jidong Oilfield Company, Tangshan
Abstract:Based on the safety requirements of the artificial islands for marine production of oil and gas, the monitoring methods and technical requirements are put forward for the artificial islands in coastal areas during operation stage. Based on researches on the safety monitoring automatic system for the artificial island of 1-3# of Jidong Oilfield Company, a safety monitoring automatic system for the artificial islands in the coastal areas in China is first developed and established so as to realize real-time automatic monitoring, data processing, information release and warning for the artificial islands in the coastal areas. The preliminary operation results show that the artificial island 1-3# exhibits obvious nonuniform settlement and shrinkage phenomenon during operation period. The research results will provide technical basis and support for the safe construction and management of the artificial islands in the coastal areas during operation stage. It can be used as a reference to the safety monitoring of the coastal projects during operation stage.
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水运工程学报》浏览原始摘要信息
点击此处可从《水利水运工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号