首页 | 本学科首页   官方微博 | 高级检索  
     

莱钢型钢3200m~3高炉限产操作实践
引用本文:郭新超,汤登军.莱钢型钢3200m~3高炉限产操作实践[J].山东冶金,2014(5):12-13.
作者姓名:郭新超  汤登军
作者单位:莱芜钢铁集团 银山型钢炼铁厂,山东 莱芜,271104
摘    要:莱钢型钢3 200 m3高炉为实现限产计划,采用风口加衬套的方法来控制风速和鼓风动能,避免了局部堵风口、更换小风口的弊端,配合减氧、缩矿批,调整布料制度、造渣制度,加强炉前操作,优化出铁组织等措施,炉况顺行,指标稳定。

关 键 词:高炉  限产  风口  加衬套  风量

Operation PracticeofLim itingProduction of3200m 3BF in Laiwu Steel
GUO Xinchao,TANG Dengjun.Operation PracticeofLim itingProduction of3200m 3BF in Laiwu Steel[J].Shandong Metallurgy,2014(5):12-13.
Authors:GUO Xinchao  TANG Dengjun
Affiliation:(The lronmaking Plant of Yinshan Section Steel, Laiwu Iron and Steel Group Corporation, Laiwu 271104, China)
Abstract:In order to realize the plan of limiting production for the 3 200 m3 BF in Laiwu Steel, the method of adding a bushing in the tuyere was used to control the wind speed and blast kinetic energy, avoiding drawbacks of blocking local tuyere and changing to small tuyere. Cooperating some measures such as reducing oxygen and ore batch, adjusting burden distribution system and slagging system, strengthening casthouse operation and optimizing tapping organization, the furnace conditions was smooth and the indicators was stable.
Keywords:blast furnace  limiting production  tuyere  adding bushing  wind amount
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号