首页 | 本学科首页   官方微博 | 高级检索  
     

基于PSASP_UPI的光伏建模及混合步长仿真*
引用本文:邱少引,雷霞,丁吉,刘增庆,李逐云,余飞鸿. 基于PSASP_UPI的光伏建模及混合步长仿真*[J]. 电测与仪表, 2018, 55(17): 68-73
作者姓名:邱少引  雷霞  丁吉  刘增庆  李逐云  余飞鸿
作者单位:西华大学电气与电子信息学院
基金项目:国家自然科学基金项目(51677020);教育部春晖计划项目(Z2016145);研究生创新基金项目(ycjj2017065)
摘    要:PSASP_UPI可将PSASP和Simulink结合起来,弥补PSASP在光伏建模上的劣势,但PSASP在仿真时不会控制UP的仿真步长,导致其对Simulink模型利用不完全,甚至仿真结果失真。针对该问题,提出了一种基于改进UP的混合步长仿真方法。利用Simulink Code将光伏并网模型编译成C代码并嵌入UP中,在VC环境改进UP为每接收一次PSASP的计算结果就把它作为初值单步计算一百次,保存每次计算结果并将最后一次的计算结果传给下一时刻的PSASP。PSASP搭建的CEPRI 36节点光伏并网仿真算例表明改进UP的混合步长仿真的方法相对固定步长仿真方法更具精确性和可行性。

关 键 词:PSASP_UPI  Simulink Code  UP  光伏建模  混合步长仿
收稿时间:2017-07-26
修稿时间:2017-07-26

PV modeling and hybrid step simulation based on PSASP_UPI
Qiu Shaoyin,Lei Xi,Ding Ji,Liu Zengqing,Li Zhuyun and Yu Feihong. PV modeling and hybrid step simulation based on PSASP_UPI[J]. Electrical Measurement & Instrumentation, 2018, 55(17): 68-73
Authors:Qiu Shaoyin  Lei Xi  Ding Ji  Liu Zengqing  Li Zhuyun  Yu Feihong
Affiliation:School of Electrical Engineering and Electronic Information,Xihua University,School of Electrical Engineering and Electronic Information,Xihua University,School of Electrical Engineering and Electronic Information,Xihua University,School of Electrical Engineering and Electronic Information,Xihua University,School of Electrical Engineering and Electronic Information,Xihua University,School of Electrical Engineering and Electronic Information,Xihua University
Abstract:PSASP_UPI can combine PSASP and Simulink to make up for the disadvantages of PSASP in PV modeling. However, PSASP cannot control the simulation step size of UP, which may resulting in incomplete utilization of Simulink model and even distortion. In view of the problem, a hybrid step size simulation method based on improved UP is proposed in this paper. The photovoltaic grid connected model is compiled into C code through Simulink Code and embedded to UP. The UP is improved in VC to calculate one hundred times step-by-step every time it receiving PSASP"s calculations at one time, saving each calculation result and passing the last calculation to the PSASP at the next time. The simulation example of CEPRI 36 nodes PV grid connected model built in PSASP shows that the improved UP hybrid step simulation method is more accurate and feasible compared with the fixed step size simulation method,
Keywords:PSASP_UPI   Simulink Code   UP   PV modeling   hybrid step simulation
本文献已被 CNKI 等数据库收录!
点击此处可从《电测与仪表》浏览原始摘要信息
点击此处可从《电测与仪表》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号