钢框架-钢板剪力墙结构修复后的使用性能指标
引用本文:袁昌鲁,李嘉锴,杨宁. 钢框架-钢板剪力墙结构修复后的使用性能指标[J]. 计算机辅助工程, 2021, 30(4): 13-21. DOI: 10.13340/j.cae.2021.04.003
作者姓名:袁昌鲁  李嘉锴  杨宁
作者单位:山东建筑大学土木工程学院,济南250100
基金项目:山东省自然科学基金资助项目(ZR2016EEQ27)
摘    要:为便于钢框架-钢板剪力墙结构震后快速修复,统计既有实验结果,提出修复后使用的三级性能指标,基于等效拉杆理论,研究结构在侧向载荷作用下塑性铰的出现顺序、层间位移角和结构应力发展等情况,并建立有限元模型对指标进行验证.结果 表明:在一级修复性能指标(位移角1/220)下,结构板墙轻微受损,对应的修复方法为对板墙进行轻微修复;在二级修复性能指标(位移角1/110)下,结构板墙几乎全面进入塑性状态,需要考虑换板或增加加劲肋修复;在三级修复性能指标(位移角1/85)下,结构板墙已经全部进入屈服状态,而且框架梁端也出现塑性铰,此时不仅需要对板墙进行修复,还要考虑对框架进行修复.

关 键 词:钢板剪力墙  等效拉杆模型  层间位移角  塑性铰  PUSHOVER分析  性能指标
收稿时间:2021-11-20
修稿时间:2021-12-01

Study on service performance index of steel frame-plate shear wall structure after repair
YUAN Changlu,LI Jiakai,YANG Ning. Study on service performance index of steel frame-plate shear wall structure after repair[J]. Computer Aided Engineering, 2021, 30(4): 13-21. DOI: 10.13340/j.cae.2021.04.003
Authors:YUAN Changlu  LI Jiakai  YANG Ning
Affiliation:Shandong Jianzhu University,School of Civil Engineering,Shandong Jianzhu University,School of Civil Engineering,shandong jianzhu university
Abstract:In order to study the rapid repair of steel frame-steel plate shear wall structure after earthquake, through statistics of existing test results, three-level repair performance indicators are proposed. Based on the equivalent tie rod theory, a finite element model is established to verify the indicators, and the structural performance is studied. Indexes such as the appearance sequence of plastic hinges, the displacement angle between layers and the development of structural stress under lateral load. The results show that the slab wall is slightly damaged under the service performance index (1/220 displacement angle) after the first-level repair of the structure. The corresponding repair method refers to the need to slightly repair the slab wall. Under the service performance index (1/110 displacement angle) of the structure after the secondary repair, almost the full section of the slab wall enters the plastic state, and it is necessary to consider replacing the slab or adding stiffeners for repair. Under the service performance index (1/85 displacement angle) of the structure after the third-level repair, the slab wall has all entered yielding, and plastic hinges have also appeared at the frame beam end. At this time, not only the slab wall needs to be repaired, but also the frame is considered. Repair it.
Keywords:Steel plate shear wall   equivalent tie rod model   plastic hinge: PUSHOVER analysis   Performance indicators