首页 | 本学科首页   官方微博 | 高级检索  
     

山美水电站1#,2#机组增容改造
引用本文:黄少阳. 山美水电站1#,2#机组增容改造[J]. 广西水利水电, 2008, 0(6)
作者姓名:黄少阳
作者单位:福建省泉州市山美水库管理处,福建,泉州,362321
摘    要:山美水电站1#,2#机组增容改造经5个方案比选后,采用更换定子铁芯、定子绕组、转子磁极线圈,并将绝缘等级提高到F级,并改造通风冷却系统,在保持原水电站水工建筑、引水管道、蜗壳、固定导叶、导叶、尾水管、主轴等大件基本不改变的条件下,重新设计、研制新转轮的方案,实施后,单机出力由15 MW增至16.5 MW,实现了提高增容技改的改造目标。

关 键 词:水电站  水轮发电机组  增容改造

Upgrade of No.1 and No.2 turbine generator units for Shanmei Hydropower Station
HUANG Shao-yang. Upgrade of No.1 and No.2 turbine generator units for Shanmei Hydropower Station[J]. Gx Water Resources & Hydropower Engineering, 2008, 0(6)
Authors:HUANG Shao-yang
Abstract:Based on comparison of five alternatives,the upgrade measures for No.1 and No.2 turbine generator units of Shanmei Hydropower Station are determined,including replacing stator core,stator winding and rotor pole winding;upgrading the insulation class to F;modifying ventilation system;designing and manufacturing new runner to increase the unit output from 15MW to 16.5MW with the original hydraulic structure,diversion conduit,spiral case,stay vane,wicket gate,draft tube,main shaft etc.kept unchanged.
Keywords:Hydropower station  turbine generator unit  upgrade
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号