首页 | 本学科首页   官方微博 | 高级检索  
     

煤矿栈桥顶升纠倾设计
引用本文:赵来顺,唐丽云,邹仁华,王芝银.煤矿栈桥顶升纠倾设计[J].工业建筑,2007,37(4):84-87.
作者姓名:赵来顺  唐丽云  邹仁华  王芝银
作者单位:西安科技大学,建工学院,西安,710054
摘    要:首次应用数值模拟方法对煤矿栈桥发生较大量下沉、倾斜问题进行建筑病害分析,提出柱基下预压托换桩和斜撑架断柱相结合的综合顶升纠倾法治理方案。结合结构性能分析,给出顶升纠倾的转动轴位置、柱体断口位置、加载点布置、加载及位移控制量确定的设计要点,并用数值模拟方法予以验证,使后续施工达到预期目的。

关 键 词:煤矿栈桥  顶升纠倾  数值模拟  病害治理
修稿时间:2006-10-20

LIFTING AND RECTIFYING DESIGN OF COALMINE TRANSSHIPMENT GALLERY
Zhao Laishun,Tang Liyun,Zou Renhua,Wang Zhiyin.LIFTING AND RECTIFYING DESIGN OF COALMINE TRANSSHIPMENT GALLERY[J].Industrial Construction,2007,37(4):84-87.
Authors:Zhao Laishun  Tang Liyun  Zou Renhua  Wang Zhiyin
Abstract:Based on analyzing the reason of the settlement and slope of transshipment gallery in coalmine,numerical simulation was firstly used in analyzing the damage of the building and comprehensive uplifting underpinned piles under column foundation and intercepting brace columns.With analyzing structural function,rotating axis,the intercepting position of column,loading point layout and the decision of load and displacement value were stated.Numerical simulation method was used to prove it.Expected targets were achieved in post construction and good effect of treating the specific structure was obtained.
Keywords:coalmine transshipment gallery lift and rectification numerical simulation damage treatment
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号