首页 | 本学科首页   官方微博 | 高级检索  
     


Life cycle assessment and evaluation of energy payback time on high-concentration photovoltaic power generation system
Authors:A Nishimura  Y Hayashi  K Tanaka  M Hirota  S Kato  M Ito  K Araki  EJ Hu
Affiliation:1. Division of Mechanical Engineering, Graduate School of Engineering, Mie University, 1577 Kurimamachiya-cho, Tsu, Mie 514-8507, Japan;2. Integrated Research Institute, Tokyo Institute of Technology, I6-25 2-12-1 Ookayama, Meguro-ku, Tokyo 152-8550, Japan;3. R&D Lab, Daido Steel Co., Ltd., 2-30 Daido-cho, Minami-ku, Nagoya 457-8545, Japan;4. School of Mechanical Engineering, The University of Adelaide, North Terrace, Adelaide, SA 5005, Australia
Abstract:In this study, the environmental load of photovoltaic power generation system (PV) during its life cycle and energy payback time (EPT) are evaluated by LCA scheme. Two hypothetical case studies in Toyohashi, Japan and Gobi dessert in China have been carried out to investigate the influence of installation location and PV type on environmental load and EPT. The environmental load and EPT of a high-concentration photovoltaic power generation system (hcpV) and a multi-crystalline silicon photovoltaic power generation system (mc-Si PV) are studied. The study shows for a PV of 100 MW size, the total impacts of the hcpV installed in Toyohashi is larger than that of the hcpV installed in Gobi desert by 5% without consideration of recycling stage. The EPT of the hcpV assumed to be installed in Gobi desert is shorter than EPT of the hcpV assumed to be installed in Toyohashi by 0.64 year. From these results, the superiority to install PV in Gobi desert is certificated. Comparing with hcpV and mc-Si PV, the ratio of the total impacts of mc-Si PV to that of hcpV is 0.34 without consideration of recycling stage. The EPT of hcpV is longer than EPT of mc-Si PV by 0.27 year. The amount of global solar radiation contributing to the amount of power generation of mc-Si PV is larger than the amount of direct solar radiation contributing to the amount of power generation of hcpV by about 188 kW h/(m2 year) in Gobi desert. Consequently, it appears that using mc-Si PV in Gobi desert is the best option.
Keywords:High-concentration photovoltaic power generation system  Life cycle assessment  Energy payback time  Gobi desert
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号