600MW超临界机组大板梁吊装
引用本文:李维伟. 600MW超临界机组大板梁吊装[J]. 贵州电力技术, 2011, 0(12): 73-74
作者姓名:李维伟
作者单位:贵州电力建设第一工程公司,贵州贵阳550002
摘    要:贵州兴义电厂2×600MW新建工程是我省首台超临界机组,锅炉大板梁的尺寸及重量均比亚临界机组大板梁大,锅炉大板梁的吊装方案经过充分论证和分析,最后采用SCC6300630t履带吊吊装大板梁,以保证合同规定的工期。

关 键 词:超临界机组  大板梁  吊装  方案

Large girder hoisting for 600 MW supercritical Unit
Li Weiwei. Large girder hoisting for 600 MW supercritical Unit[J]. Guizhou Electric Power Technology, 2011, 0(12): 73-74
Authors:Li Weiwei
Affiliation:Li Weiwei (Guizhou No. 1 Power Industry Construction Company, Guiyang 550003 Guizhou,China)
Abstract:The new project of 2× 600MW unit in Xingyi Power Plant is the first supercritical unit in Guizhou Province. The size and weight of supercritical boiler girder is larger than the suberitieal one. The boiler girder hoisting programme is analyzed and testified. Fi- nally, it adopts the SCC6300 360t crawler belt girder hoisting to ensure the provisions of the contract.
Keywords:supercritical unit  large girder  hoisting  program